Skip to main content
FixturFab

Production PCB Test Fixtures for Manufacturing

Production PCB test fixtures built for millions of cycles. Side probing, high voltage, RF shielding, exchangeable cartridges. Configure online.

MA 2111 Closed
  • Starting at $7,399 — configure online with instant pricing
  • Millions of test cycles with factory-grade materials
  • Multiple base sizes from 170mm x 145mm to 600mm x 450mm
  • Exchangeable cartridges for board design updates
  • Side probing: USB 3.0/3.1, RJ45, DC Jack, and more
  • High voltage protection and RF shielding
  • Safety interlocks with cycle counting
  • 6-8 weeks standard; 2-3 weeks or 1-2 days with proactive stocking

Production fixtures are built for the factory floor. Millions of test cycles, advanced capabilities — side probing, high voltage protection, RF shielding — and exchangeable cartridges for board design updates without replacing the fixture. When a fixture failure stops a manufacturing line, these are engineered to prevent that.

$7,399
Starting price — 6-8 weeks standard, accelerated delivery available

Why Production fixtures#

Millions of cycles, no degradation. Factory-grade composites and pneumatic actuation maintain probe alignment and contact pressure across the full fixture lifecycle. Dev Pro handles 5,000–10,000 cycles well. Production lines running 500 boards per shift need fixtures that perform at cycle 500,000.

Exchangeable cartridges. Same system as Dev Pro — one base, multiple board designs. The base is a capital investment; cartridges are the recurring cost for new boards. Replica cartridge pricing for multi-station rollouts makes deploying identical fixtures across test stations and CM sites cost-effective.

Multiple base sizes. From 170mm x 145mm to 600mm x 450mm, covering the full range of PCBA form factors. Small IoT modules, large control boards, and everything between.

Accelerated delivery available. Standard delivery is 6-8 weeks. With proactive material stocking: 2-3 weeks. With pre-staged materials: 1-2 day expedited. The production fixture timeline is a supply chain decision you can make early — talk to sales before your ramp to arrange stocking.

Advanced capabilities#

Side probing. Access edge connectors and board I/O — USB 3.0/3.1, RJ45, DC Jack, USB 2.0 Type B. Exercise board interfaces during test without manual cable insertion. Essential for functional test plans that need to verify I/O alongside probe-based measurements.

High voltage protection. Boards with voltages above 60V or currents above 2A require proper isolation between the operator and DUT. Safety interlocks and shielding protect operators during high-voltage testing sequences.

RF shielding. For PCBAs with wireless radios, RF front ends, or high-frequency signal paths. Shielded fixture enclosures maintain signal integrity during test, preventing ambient interference from causing false failures on your production line.

Safety interlocks. Lid switches prevent open-fixture actuation. Cycle counters track fixture usage for maintenance scheduling and production reporting. When fixtures run multiple shifts, these features keep operations predictable.

Specifications#

SpecificationDetail
ActuationPneumatic/Vertical
Test cycle lifetimeMillions of cycles
Base sizesMultiple (170mm x 145mm to 600mm x 450mm)
ConstructionFactory-grade composites
Cartridge materialsPer configuration
Exchangeable cartridgesYes
Dual-side probingYes (advanced)
Delivery6-8 weeks standard; 2-3 weeks with proactive stocking; 1-2 days when pre-staged

Configuration options#

Configure your production fixture in Studio with instant pricing. You'll select:

  • Base size: Multiple options from 170mm x 145mm to 600mm x 450mm
  • Advanced features: Side probing, high voltage protection, RF shielding, and safety interlocks as needed for your test plan
  • Signal interface: How your instrumentation connects to the fixture — see signal interface options
  • Proactive material stocking: For accelerated delivery timelines, contact sales to arrange material staging before your production ramp

When to choose Production#

Test volume exceeds 10,000 boards. Dev Pro is rated for 5,000–10,000 test cycles. If your production plan calls for higher volumes or multi-year deployments, production-grade durability is necessary.

You need side probing, high voltage, or RF shielding. If your functional test plan requires exercising board I/O, testing high-voltage circuits, or maintaining RF signal integrity, the fixture needs to support those capabilities.

Fixtures run all day on production lines. When a fixture failure stops a manufacturing shift, production-grade construction pays for itself quickly. Operators are waiting, boards are stacking up, and your CM is billing for idle time.

Deploying to CMs for sustained manufacturing. Contract manufacturers expect professional tooling that meets their acceptance standards. Production fixtures with pneumatic actuation, safety interlocks, and clean signal interfaces are what CMs work with.

Still in development or running moderate volumes? Dev Pro fixtures deliver exchangeable cartridges and vertical actuation at 2-3 week turnaround.

Ready to configure?#

Have your board dimensions, test point count, target volume, and production ramp date ready. Upload your files in Studio, select test points, and configure your fixture. Pricing shows immediately — most configurations take under ten minutes.

For multi-station deployments, delivery coordination around a production ramp, or proactive stocking arrangements, contact us to plan your timeline.

Configure your Production fixture

Upload your design files, select test points, and get instant pricing. No quote cycles, no waiting for a sales call.

Ready to Get Started?

Configure your fixture in minutes. Upload your design files and get instant pricing.