Skip to main content
FixturFab

Test Fixture Types

Compare FixturFab's fixture tiers to find the right balance of features, lead-time, and price for your testing requirements.

FixturFab offers custom test fixtures optimized for different stages of hardware development. These mechanical-only bed of nails test fixtures scale from rapid prototyping through high-volume production.

Fixture Comparison#

FeatureDevDev ProProduction
Best forProto/EVT/DVTEVT/DVT/PVTPVT/Production
Starting price$999 (new) / $499 (replica)$1,799$7,399
Lead time2 weeks2 weeks6 weeks
Max board size196×180mm540×310mm
Test point capacityUp to 200Up to 930
MaterialsAcrylic, MDFAcrylic, MDFSteel, aluminum, acrylic
Closing mechanismSweep actionLinear actionLinear action
Service life1K+ cycles500K+ cycles

Dev Fixtures#

The most affordable fixture for basic testing, designed for early development phases. Dev fixtures use cost-effective materials and rapid fabrication to deliver quick turnaround at minimal investment.

Best for: Initial prototypes, firmware development, engineering validation

Dev Pro Fixtures#

A stepping stone toward manufacturing with enhanced capabilities. Dev Pro fixtures bridge the gap between rapid prototyping and production-grade tooling.

Best for: Late-stage development, pilot production, test specification validation

Production Fixtures#

Reliable results for millions of tests. Production fixtures use premium materials and precision manufacturing for sustained high-volume testing.

Best for: Manufacturing lines, high-volume production, extended service life requirements

Choosing the Right Tier#

Consider these factors when selecting a fixture tier:

Volume: How many boards will you test? Dev fixtures handle thousands of cycles; Production fixtures handle hundreds of thousands.

Stage: Where are you in the product lifecycle? Match fixture investment to design stability.

Complexity: Do you need top or side probing? Dual-sided probing requires Production-tier fixtures.

Timeline: Dev and Dev Pro fixtures ship in 2 weeks; Production fixtures require 6 weeks.

Get Started#

Use FixturFab Studio to configure your fixture and receive instant pricing, or explore detailed specifications for each tier:

Last updated:January 25, 2025